1. Sinter plants
• Sinter plant, OJSC Ilich Iron and Steel Works, Installation and adjustment of process equipment
details...
• Sinter plant, OJSC Iron and Steel Works Azovstal, Installation and adjustment of process equipment. Reconstruction of sinter plant
• Reconstruction of sinter plant ¹2 at OJSC Alchevsk Iron and Steel Works
• Reconstruction of sinter plant with replacement of 2 sinter machines at OJSC Tulachermet, Russia
2. Blast Furnaces
• Blast Furnaces of OJSC Alchevsk Iron and Steel Works. Reconstruction with replacement of mechanical equipment of furnaces and casthouses.
details...
• Blast Furnaces of OJSC Ilich Iron and Steel Works. Installation of mechanical equipment of furnaces and casthouses. Replacement of aspiration systems and troughs
• Blast Furnaces of OJSC Azovstal. Reconstruction of casthouses with replacement of troughts, installation of equipment and arrangement of aspiration systems (gas cleaning systems with electrostatic precipitators)
• Blast Furnaces ¹1 and ¹2 of JSC Donetsk Iron and Steel Works. Overhaul reconditioning with reconstruction of cast house, arrangement of pulverized coal injection into blast furnaces
• Blast Furnaces of OJSC Òulachermet, Russia. Overhaul reconditioning of blast furnaces ¹1, ¹2 and ¹3, installation of gas cleaning systems with MiFiB electrostatic precipitators, mechanical equipment and cast house troughs of casthouses of BF no 2 and 3, repair of pig iron continuous casting machines
• Blast Furnaces¹2 of metallurgical complex Ispat-Annaba, Àlgeria. Reconstruction of BF with replacement of charging equipment.
3. Steel - melting aggregates:
• LD Converter shops, OJCS Azovstal Iron and Steel Works. Installation of LD Converters. Replacements of LD Converters, capacity of 350 tons
details...
• VAI Fuchs VD-plants, 350 tons, OJSC Azovstal Iron and Steel Works, installation and adjustment
• Water distribution device -60 at OJSC Azovstal Iron and Steel Work, OJSC Ilich Iron and Steel Works. Installation of equipment and piping
• Continuous casting machines (CCM): slab and bloom casters. Installation and adjustment at OJSC Azovstal Iron and Steel Works, OJSC Ilich Iron and Steel Works, OJSC Àlchevsk Iron and Steel Works, OJSC Ånakievo Iron and Steel Works; JSC STAKS, Krasny Sulin, Russia
details...
• Electric arc furnaces
• Ladle Furnaces. Installation and adjustment at JSC Donetskstal Iron and Steel Works, OJSC Alchevsk Iron and Steel Works, OJSC Enakievo Iron and Steel Works
4. Rolling mills:
• Sheet mills. Installation and adjustment at OJSC Azovstal Iron and Steel Works (rolling mill-3600), OJSC Ilich Iron and Steel Works (rolling mil-3000), OJSC Alchevsk Iron and Steel Works (rolling mill- 2800/3000), JSC Donetskstal Iron and Steel Works (rolling mill-2300), OJSC Magnitogorsk Iron and Steel Works (rolling mill-5000)
details...
• Section-rolling mills. Installation and adjustment at OJSC Makeevka Iron and Steel Works (rolling mill-390, rolling mill-150), OJSC Alchevsk Iron and Steel Works (rolling mill-600)
5. Electrical overhead cranes of general and special purpose with capacity range of 5 - 450 tons installed at industrial enterprises of Ukraine and Russia.
6. Process line for metal-polymer coating installed and adjusted at OJSC Severslat RUSSIA, Cherepovets.
details...
7. Vertical calciners for production of dolomitic lime installed and adjusted at Dokuchaevsk Flux dolomite industrial complex.
8. Lime kiln shop equipment, vertical calciners, crushing and screening plants with tunnels, and compressor stations installed and adjusted at OJSC Ilich Iron and Steel Works
9. Process equipment for concrete and cement production. including rotary kiln furnaces, ball mills, coarse and fine mills, gas cleaning systems with electrical precipitators, cement sack filling and sealing production line etc installeded and adjusted at OJSC Dontsement, Avrosievka.
10. Nitrogen compressor stations installed and adjusted at various locations.
11. Air compressor stations installed and adjusted at various locations.
12. Tube fans installed and adjusted at various locations.
13. Pump stations of water supply system installed and adjusted at various locations.
14. Pump-and-accumulator stations and oil cellars with centralized grease and lubrication systems installed and adjusted at various locations.
Geography of our works: